{"id":1712,"date":"2026-10-29T16:29:50","date_gmt":"2026-10-29T08:29:50","guid":{"rendered":"https:\/\/brt-testing.com\/?p=1712"},"modified":"2026-10-29T16:29:50","modified_gmt":"2026-10-29T08:29:50","slug":"astm-e119-fire-resistance-testing-explained","status":"publish","type":"post","link":"https:\/\/brt-testing.com\/pt\/astm-e119-fire-resistance-testing-explained\/","title":{"rendered":"ASTM E119 Fire Resistance Testing Explained"},"content":{"rendered":"<h2>The Short Answer<\/h2>\n<p><strong>ASTM E119 is not one measurement but three, taken at the same time on the same specimen: heat transmission, hot-gas transmission and load-carrying ability.<\/strong> The standard&#8217;s significance clause sets out exactly that \u2014 measurement of the transmission of heat, measurement of the transmission of hot gases through the specimen, and for load-bearing elements measurement of the load-carrying ability during the exposure <a href=\"https:\/\/store.astm.org\/e119.html\" target=\"_blank\" rel=\"noopener\">1<\/a>. For individual load-bearing members such as beams and columns, the load-carrying measurement is made with consideration for the end support conditions, that is, restrained or not restrained [1].<\/p>\n<p>That structure explains almost everything else about E119. Because the test produces three different measurements, an E119 rating is a statement about which of them a given assembly held, for how long, under a specified exposure. And because it is made on a specimen of a particular construction, the result belongs to that construction rather than to any product inside it.<\/p>\n<figure style=\"margin:24px 0\">\n  <img decoding=\"async\" src=\"https:\/\/brt-testing.com\/wp-content\/uploads\/2026\/10\/fire-resistance-test-furnace.avif\" alt=\"Fire resistance test furnace used for ASTM E119 testing of wall, floor and column assemblies\" width=\"1600\" height=\"900\" style=\"width:100%;height:auto\" loading=\"lazy\"><figcaption style=\"font-size:13px;color:#666;margin-top:6px\">An E119 furnace is a controlled environment, not a simulation of a room fire. What it reproduces is a specified exposure, held to a specified tolerance.<\/figcaption><\/figure>\n<h2>What E119 Covers<\/h2>\n<p>The scope is written around assemblies rather than products. E119 applies to assemblies of masonry units and to composite assemblies of structural materials for buildings, including loadbearing and other walls and partitions, columns, girders, beams, slabs, and composite slab and beam assemblies for floors and roofs, and to other assemblies and structural units that constitute permanent integral parts of a finished building [1].<\/p>\n<div class=\"brt-table-wrap\" style=\"overflow-x:auto;margin:1.5em 0;-webkit-overflow-scrolling:touch\">\n<table style=\"border-collapse:collapse;width:100%;table-layout:auto\">\n<colgroup>\n<col style=\"width:38.2%\">\n<col style=\"width:17.37%\">\n<col style=\"width:44.43%\"><\/colgroup>\n<thead>\n<tr>\n<th style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word;background:#f2f4f7;font-weight:600\">Element<\/th>\n<th style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word;background:#f2f4f7;font-weight:600\">Covered by E119<\/th>\n<th style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word;background:#f2f4f7;font-weight:600\">Note<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Load-bearing walls and partitions<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Yes [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Load-carrying ability is one of the three measurements<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Non-load-bearing walls and partitions<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Yes [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Integrity and insulation dominate the result<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Columns, girders and beams<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Yes [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">End support conditions must be stated [1]<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Floor and roof slabs, composite slab and beam assemblies<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Yes [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Fire exposure from below in the usual arrangement<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Doors<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Not the E119 route<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Doors have their own assembly standards<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Windows and glazing<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Not the E119 route<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Window assemblies are tested under their own standards<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Applied finishes and reaction to fire<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Not this standard<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">That is a reaction-to-fire question, not a resistance question<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3>Where the scope is most often stretched<\/h3>\n<p>The last three rows are where most misapplication happens. E119 answers &#8220;how long does this assembly hold&#8221;, not &#8220;how does this product react to fire&#8221;, and openings inside a rated wall are handled by their own documents rather than by E119.<\/p>\n<h2>Three Measurements, One Test<\/h2>\n<p>The measurement list in the significance clause is short and worth reading as a list of criteria rather than of instruments.<\/p>\n<div class=\"brt-table-wrap\" style=\"overflow-x:auto;margin:1.5em 0;-webkit-overflow-scrolling:touch\">\n<table style=\"border-collapse:collapse;width:100%;table-layout:auto\">\n<colgroup>\n<col style=\"width:34.3%\">\n<col style=\"width:38.95%\">\n<col style=\"width:26.75%\"><\/colgroup>\n<thead>\n<tr>\n<th style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word;background:#f2f4f7;font-weight:600\">Measurement<\/th>\n<th style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word;background:#f2f4f7;font-weight:600\">What it establishes<\/th>\n<th style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word;background:#f2f4f7;font-weight:600\">Typical instrumentation<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Transmission of heat [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Whether the unexposed side stays cool enough to prevent ignition on the far side<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Thermocouples on the unexposed face<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Transmission of hot gases [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Whether flame or hot gas finds a path through the assembly<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Observation along joints, penetrations and edges<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Load-carrying ability, for load-bearing elements [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Whether the assembly keeps supporting its design load while burning<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Load applied through the testing frame<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Load-carrying ability of beams and columns, with end support conditions [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Whether the member survives in a restrained or unrestrained condition<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Load plus the specified end restraint<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3>Heat transmission is the criterion people forget<\/h3>\n<p>An assembly can remain visually intact and still fail, because the criterion is not only whether flame appears on the cold side but whether enough heat arrives there. This is why thermocouple placement and the number of measuring points are specified rather than left to the laboratory, and why a report that gives a rating without the temperature data is harder to defend than one that includes it.<\/p>\n<h3>Hot-gas transmission is an integrity question<\/h3>\n<p>The second measurement is about paths rather than surfaces. Joints, perimeter gaps, penetrations and service openings are where hot gas gets through, and they are the reason the specimen has to be built the way the product will be built rather than the way it is easiest to assemble in a laboratory.<\/p>\n<h3>Load-carrying ability only exists if a load is applied<\/h3>\n<p>A non-load-bearing partition and a load-bearing wall can be built from similar materials and produce completely different ratings, because only one of them is carrying anything. When a supplier quotes a rating without saying whether the assembly was loaded, the number is ambiguous.<\/p>\n<h2>Restrained or Unrestrained: The Distinction That Changes the Rating<\/h2>\n<p>For beams and columns, E119 requires the load-carrying measurement to consider the end support conditions, restrained or not restrained [1]. The distinction is not a laboratory detail; it describes how the member is held in the real building, and it changes how the member behaves when it heats and tries to expand.<\/p>\n<p>A restrained member is held against thermal expansion by the surrounding structure, so it develops forces it would not otherwise see. An unrestrained member is free to expand. The same steel member can therefore produce two different ratings depending on which condition is claimed, and a specification that quotes one without the other has left out the part that decides whether it applies.<\/p>\n<p>This is one of the clearest differences between the North American and European traditions, and it is the reason a US submittal asks a question that a European classification does not: not only how long, but held how.<\/p>\n<h2>The Standard Fire Is a Specified Exposure, Not a Real Fire<\/h2>\n<p>E119 exposes the specimen to a standard fire controlled to achieve specified temperatures throughout a specified time period, and where required the exposure is followed by a specified standard fire hose stream applied in accordance with Practice E2226 [1]<a href=\"https:\/\/store.astm.org\/e2226.html\" target=\"_blank\" rel=\"noopener\">2<\/a>. The standard is explicit that the exposure is not representative of all fire conditions, because conditions vary with the amount, nature and distribution of fire loading, ventilation, compartment size and configuration, and heat sink characteristics of the compartment [1].<\/p>\n<h3>Reading the exposure clause<\/h3>\n<p>That sentence is the most useful thing in the document for anyone arguing about a real building. A one-hour rating does not mean the assembly survives one hour of any fire; it means the assembly met the criteria for one hour of this exposure. The variables the standard lists are precisely the ones a fire engineer adjusts when assessing a real compartment, which is why an E119 result is an input to that assessment rather than a substitute for it.<\/p>\n<h2>Why a Rating Belongs to a Design, Not a Product<\/h2>\n<p>E119 states that it does not provide information as to the performance of test specimens constructed with components or lengths other than those tested [1]. It also warns, in the same significance clause, that variation from the test conditions or test specimen construction \u2014 size, materials, method of assembly \u2014 changes the result [1].<\/p>\n<p>The practical consequence is the concept most European suppliers meet last: in the North American market a fire-resistance rating is attached to a described assembly, usually published as a design with a number, listing every component and its acceptable substitutes. The product is one line in that description. Selling a board, a fixing or an intumescent strip into that market means being inside a listed design rather than holding a test report of your own.<\/p>\n<p>Our walkthrough of <a href=\"https:\/\/brt-testing.com\/fire-resistance-testing-for-walls-and-partitions\/\">fire resistance testing for walls and partitions<\/a> covers the specimen build in more detail; the point here is narrower \u2014 the design is the unit of claim.<\/p>\n<h2>The Hose Stream<\/h2>\n<p>E119 makes the hose stream conditional: when required, the fire exposure is followed by the application of a specified standard fire hose stream applied in accordance with Practice E2226 [1][2]. It is not part of every rating, and a report should say whether it was applied.<\/p>\n<p>Two things follow. A rating that includes a hose stream is a stronger statement about mechanical robustness after heating than one that does not. And a project that requires the hose stream but receives a report that does not mention it has a gap that no amount of reading the rating will close.<\/p>\n<h2>What the Report Will Not Tell You<\/h2>\n<p>E119 lists three exclusions in its significance clause, and they are worth memorising because each one maps to a question buyers ask anyway [1].<\/p>\n<div class=\"brt-table-wrap\" style=\"overflow-x:auto;margin:1.5em 0;-webkit-overflow-scrolling:touch\">\n<table style=\"border-collapse:collapse;width:100%;table-layout:auto\">\n<colgroup>\n<col style=\"width:56.11%\">\n<col style=\"width:43.89%\"><\/colgroup>\n<thead>\n<tr>\n<th style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word;background:#f2f4f7;font-weight:600\">Exclusion<\/th>\n<th style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word;background:#f2f4f7;font-weight:600\">The question it leaves open<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Performance of specimens built with components or lengths other than those tested [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Can I use this design at a different height, span or board thickness?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Contribution to fire hazard through smoke, toxic gases or other products of combustion [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Is the smoke from this assembly acceptable?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Degree of control of smoke or products of combustion passing through the assembly [1]<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Does this assembly leak smoke?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>There is a fourth statement that belongs with them. E119 says classifications register comparative performance to specific fire-test conditions during the period of exposure, and shall not be construed as having determined suitability under other conditions or for use after fire exposure [1]. A rated assembly is not certified as repairable, and a building that has had a fire needs an engineering assessment rather than a rereading of the rating.<\/p>\n<h2>Reading an E119 Report: The Fields That Matter<\/h2>\n<div class=\"brt-table-wrap\" style=\"overflow-x:auto;margin:1.5em 0;-webkit-overflow-scrolling:touch\">\n<table style=\"border-collapse:collapse;width:100%;table-layout:auto\">\n<colgroup>\n<col style=\"width:43.29%\">\n<col style=\"width:56.71%\"><\/colgroup>\n<thead>\n<tr>\n<th style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word;background:#f2f4f7;font-weight:600\">Field<\/th>\n<th style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word;background:#f2f4f7;font-weight:600\">Why it decides whether the rating applies to your project<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Assembly description and design reference<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">The rating attaches to this, not to a product [1]<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Element type<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Wall, partition, column, beam, slab and roof behave differently [1]<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Loaded or unloaded<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Only a loaded assembly has a load-carrying result [1]<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Restrained or unrestrained<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Applies to beams and columns and changes the outcome [1]<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Exposure duration achieved<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">The number that gets quoted, and the least informative on its own<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Hose stream applied or not<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">A stronger or weaker statement about post-heating robustness [1][2]<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Whether the exposure held to the specified temperatures<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Whether the run is usable at all [1]<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">Components and permissible substitutions<\/td>\n<td style=\"border:1px solid #c9ced6;padding:9px 11px;vertical-align:top;overflow-wrap:break-word\">The list that decides whether your product is inside the design [1]<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3>The three fields that decide usability<\/h3>\n<p>If a report cannot answer the third, fourth and eighth rows, it is not yet a document that a specifier can use, however impressive the first number looks.<\/p>\n<h2>E119 and the Rest of the World<\/h2>\n<p>In North America, UL 263 carries the same test work under UL&#8217;s own designation for fire tests of building construction and materials, and NFPA 251 is the NFPA counterpart <a href=\"https:\/\/www.shopulstandards.com\/ProductDetail.aspx?productId=UL263\" target=\"_blank\" rel=\"noopener\">3<\/a><a href=\"https:\/\/www.nfpa.org\/codes-and-standards\/nfpa-251-standard-development\/251\" target=\"_blank\" rel=\"noopener\">4<\/a>. A laboratory often reports to E119 and lists to UL 263, which is why a single test can produce two document references.<\/p>\n<h3>Two designations, one test run<\/h3>\n<p>In Europe the equivalent role is played by the EN 1363 series for the exposure and by EN 13501-2 for the classification, and the vocabulary shifts from a rating attached to a design to a classification expressed as letters and minutes. The two systems are not convertible: they differ in specimen preparation, in instrumentation, in how restraint is handled and in what the resulting document claims. A project that needs both markets needs both tests, and our note on <a href=\"https:\/\/brt-testing.com\/what-is-the-difference-between-fire-rating-and-fire-resistance-rating\/\">fire rating versus fire resistance rating<\/a> covers the terminology trap that catches people first.<\/p>\n<figure style=\"margin:24px 0\">\n  <img decoding=\"async\" src=\"https:\/\/brt-testing.com\/wp-content\/uploads\/2026\/10\/fire-resistance-test.avif\" alt=\"Load-bearing wall assembly under ASTM E119 fire exposure inside a vertical fire resistance test furnace\" width=\"1200\" height=\"675\" style=\"width:100%;height:auto\" loading=\"lazy\"><figcaption style=\"font-size:13px;color:#666;margin-top:6px\">A wall specimen sealed into the furnace opening. The perimeter seal and the supporting construction are part of the assembly, so they are part of the result.<\/figcaption><\/figure>\n<h2>Equipment<\/h2>\n<p>An E119 programme needs a furnace sized for the element, a loading frame if the assembly is load-bearing, and instrumentation that records furnace temperature, unexposed-face temperature and integrity observations on the same time base. BRT&#8217;s <a href=\"https:\/\/brt-testing.com\/product\/vertical-integrated-fire-resistance-test-furnace\/\">vertical integrated fire resistance test furnace<\/a> carries wall and partition specimens, and the <a href=\"https:\/\/brt-testing.com\/product\/horizontal-fire-resistance-test-furnace\/\">horizontal fire resistance test furnace<\/a> carries floor and roof assemblies.<\/p>\n<figure style=\"margin:24px 0\">\n  <a href=\"https:\/\/brt-testing.com\/product\/horizontal-fire-resistance-test-furnace\/\"><img decoding=\"async\" src=\"https:\/\/brt-testing.com\/wp-content\/uploads\/2026\/09\/NH-XW-Horizontal-Fire-Resistance-Test-Furnace.jpg\" alt=\"Horizontal fire resistance test furnace used for ASTM E119 floor and roof assembly testing\" width=\"1200\" height=\"900\" style=\"width:100%;height:auto\" loading=\"lazy\"><\/a><figcaption style=\"font-size:13px;color:#666;margin-top:6px\">Floor and roof assemblies are tested horizontally, with the exposure applied from beneath. The frame has to carry both the specimen and, where required, the load.<\/figcaption><\/figure>\n<h2>Frequently Asked Questions<\/h2>\n<h4>What does ASTM E119 actually measure?<\/h4>\n<p>Three things in one exposure: the transmission of heat through the specimen, the transmission of hot gases through it, and for load-bearing elements the load-carrying ability during the test. For beams and columns the load-carrying measurement is made with consideration for the end support conditions, restrained or not restrained.<\/p>\n<h4>What is the difference between a restrained and an unrestrained assembly?<\/h4>\n<p>It describes how the member is held at its ends in the real building. A restrained member is held against thermal expansion and develops forces it would not otherwise see, while an unrestrained member is free to expand. The same member can produce two different ratings depending on which condition is claimed, which is why E119 requires the condition to be considered.<\/p>\n<h4>Does a one-hour E119 rating mean one hour in any fire?<\/h4>\n<p>No. E119 exposes the specimen to a standard fire controlled to achieve specified temperatures, and states that the exposure is not representative of all fire conditions because those vary with fire loading, ventilation, compartment size and configuration, and heat sink characteristics. The rating is a relative measure under that exposure.<\/p>\n<h4>Can I use an E119-rated design with a different board thickness or a different stud?<\/h4>\n<p>Not without checking the design. E119 states that it does not provide information as to the performance of specimens constructed with components or lengths other than those tested, and warns that variation in size, materials or method of assembly changes the result. The listed design names the components and the permissible substitutions.<\/p>\n<h4>Is the hose stream always part of an E119 test?<\/h4>\n<p>No. The standard makes it conditional: when required, the fire exposure is followed by a hose stream applied in accordance with Practice E2226. A report should state whether it was applied, because a rating that includes it is a stronger statement about robustness after heating.<\/p>\n<h4>Does the rating cover smoke?<\/h4>\n<p>No. E119 states that it does not evaluate the degree by which the specimen contributes to the fire hazard through smoke, toxic gases or other products of combustion, and does not measure the degree of control of smoke passing through the assembly. Smoke leakage is a separate test.<\/p>\n<h4>Is UL 263 the same as ASTM E119?<\/h4>\n<p>They cover the same test work under different designations, which is why a single laboratory run often appears in both an ASTM test report and a UL listing document. NFPA 251 is the NFPA counterpart. For a submittal, check which designation the authority having jurisdiction expects to see.<\/p>\n<h2>Conclusion: Five Questions Before You Quote a Rating<\/h2>\n<ol>\n<li><strong>Which element type?<\/strong> Wall, partition, column, beam, slab or roof \u2014 each is treated separately in the scope [1].<\/li>\n<li><strong>Loaded or unloaded?<\/strong> Only a loaded assembly has a load-carrying result, and only a loaded assembly can support a load-bearing claim [1].<\/li>\n<li><strong>Restrained or unrestrained?<\/strong> For beams and columns this decides which of two different results applies [1].<\/li>\n<li><strong>Was the hose stream applied?<\/strong> The report should say so, and the project should know whether it needs it [1][2].<\/li>\n<li><strong>Which design does the rating belong to?<\/strong> The assembly description and its permissible substitutions decide whether your product is inside the claim [1].<\/li>\n<\/ol>\n<p>If you are preparing an E119 programme and need to match a furnace and a loading arrangement to the element you are rating, <a href=\"https:\/\/brt-testing.com\/get-in-touch\/\">send BRT the assembly details<\/a> and we will map it to a test configuration.<\/p>\n<p><em>Written by the BRT fire testing applications team, Shenyang Baoruitong Automation Equipment Co., Ltd. Scope, significance and limitation statements are quoted from ASTM E119 as published; no numerical acceptance criteria are reproduced because they belong to the standard itself.<\/em><\/p>\n<h2>Sources<\/h2>\n<ol>\n<li>ASTM International \u2014 E119 Standard Test Methods for Fire Tests of Building Construction and Materials \u2014 <a href=\"https:\/\/store.astm.org\/e119.html\" target=\"_blank\" rel=\"noopener\">https:\/\/store.astm.org\/e119.html<\/a><\/li>\n<li>ASTM International \u2014 E2226 Standard Practice for Application of Hose Stream \u2014 <a href=\"https:\/\/store.astm.org\/e2226.html\" target=\"_blank\" rel=\"noopener\">https:\/\/store.astm.org\/e2226.html<\/a><\/li>\n<li>UL Standards &amp; Engagement \u2014 UL 263 Fire Tests of Building Construction and Materials, Edition 14 \u2014 <a href=\"https:\/\/www.shopulstandards.com\/ProductDetail.aspx?productId=UL263\" target=\"_blank\" rel=\"noopener\">https:\/\/www.shopulstandards.com\/ProductDetail.aspx?productId=UL263<\/a><\/li>\n<li>National Fire Protection Association \u2014 NFPA 251 Standard Methods of Tests of Fire Resistance of Building Construction and Materials \u2014 <a href=\"https:\/\/www.nfpa.org\/codes-and-standards\/nfpa-251-standard-development\/251\" target=\"_blank\" rel=\"noopener\">https:\/\/www.nfpa.org\/codes-and-standards\/nfpa-251-standard-development\/251<\/a><\/li>\n<\/ol>\n<p><!-- FAQ \/ Article JSON-LD --><br \/>\n<script type=\"application\/ld+json\">\n{\n \"@context\": \"https:\/\/schema.org\",\n \"@type\": \"FAQPage\",\n \"mainEntity\": [\n  {\n   \"@type\": \"Question\",\n   \"name\": \"What does ASTM E119 actually measure?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"Three things in one exposure: the transmission of heat through the specimen, the transmission of hot gases through it, and for load-bearing elements the load-carrying ability during the test. For beams and columns the load-carrying measurement is made with consideration for the end support conditions, restrained or not restrained.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"What is the difference between a restrained and an unrestrained assembly?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"It describes how the member is held at its ends in the real building. A restrained member is held against thermal expansion and develops forces it would not otherwise see, while an unrestrained member is free to expand. The same member can produce two different ratings depending on which condition is claimed, which is why E119 requires the condition to be considered.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Does a one-hour E119 rating mean one hour in any fire?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"No. E119 exposes the specimen to a standard fire controlled to achieve specified temperatures, and states that the exposure is not representative of all fire conditions because those vary with fire loading, ventilation, compartment size and configuration, and heat sink characteristics. The rating is a relative measure under that exposure.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Can I use an E119-rated design with a different board thickness or a different stud?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"Not without checking the design. E119 states that it does not provide information as to the performance of specimens constructed with components or lengths other than those tested, and warns that variation in size, materials or method of assembly changes the result. The listed design names the components and the permissible substitutions.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Is the hose stream always part of an E119 test?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"No. The standard makes it conditional: when required, the fire exposure is followed by a hose stream applied in accordance with Practice E2226. A report should state whether it was applied, because a rating that includes it is a stronger statement about robustness after heating.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Does the rating cover smoke?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"No. E119 states that it does not evaluate the degree by which the specimen contributes to the fire hazard through smoke, toxic gases or other products of combustion, and does not measure the degree of control of smoke passing through the assembly. Smoke leakage is a separate test.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Is UL 263 the same as ASTM E119?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"They cover the same test work under different designations, which is why a single laboratory run often appears in both an ASTM test report and a UL listing document. NFPA 251 is the NFPA counterpart. For a submittal, check which designation the authority having jurisdiction expects to see.\"\n   }\n  }\n ]\n}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>ASTM E119 is not one measurement but three, taken on the same specimen at the same time: the transmission of heat, the transmission of hot gases, and the load-carrying ability of a load-bearing element. For beams and columns the load measurement is made with consideration for the end support conditions, restrained or not restrained. This guide explains what the standard covers and where its scope is stretched, why the same member can produce two different ratings, why a rating belongs to a listed design rather than to a product, when the hose stream applies, and the three exclusions in the significance clause that leave smoke, other lengths and fire-damaged buildings outside the claim.<\/p>","protected":false},"author":1,"featured_media":1618,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1712","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/posts\/1712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/comments?post=1712"}],"version-history":[{"count":1,"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/posts\/1712\/revisions"}],"predecessor-version":[{"id":1713,"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/posts\/1712\/revisions\/1713"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/media\/1618"}],"wp:attachment":[{"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/media?parent=1712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/categories?post=1712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brt-testing.com\/pt\/wp-json\/wp\/v2\/tags?post=1712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}